QUESTION: 91
An array is behaving erratically. Upon working and troubleshooting with the vendor representative, you are told that the only way to clear the problem is to reboot the unit. The vendor states they have seen this behavior previously and feels it will return the unit to a fully operational status. Which three actions should you perform? (Choose three.)
1. Retrieve any logs or dumps that exist on the array prior to reboot.
2. Reboot the unit as soon as possible to lessen the risk of corruption.
3. Identify the actions to commit if a reboot does not fix the problem before you reboot the array.
4. If this is a known issue, request documentation outlining the symptoms, as well as the cause, if known.
Answer: A, C, D
QUESTION: 92
A company needs to create a tape backup strategy for a file system. On average the file system will be 60% full. Array based virtualization will be used to create the snapshot, which will only be used for the tape backup. Write activity on the production volume will be minimal during the backup process. Which will provide the least impact to the production application?
1. COW snapshot mounted to a tutor/mount server
2. COW snapshot mounted to the application server
3. split mirror snapshot mounted to a tutor/mount server
4. split mirror snapshot mounted to the application server
Answer: A
QUESTION: 93
What are three key advantages of deploying a director-based solution over a mesh of switches? (Choose three.)
1. lower cost
2. consistent latency
3. improved availability
4. increased hop count
5. ease of management
Answer: B, C, E
QUESTION: 94
What information must be gathered during the testing phase BEFORE allowing live customer data on the storage infrastructure? (Choose two.)
1. time to failover, both without and with simulated load
2. single points of failure in the infrastructure as well as topology mapping
3. hardware and software vendor escalation process including phone-home and/or ticket generation
4. powerup order; how long from power application to functionality per component, including dependencies.
Answer: A, D
QUESTION: 95
You notice, from continually monitoring a SAN array, that an array has a number of soft SCSI bus errors. You trace the errors back to a single drive using a vendor's event tool. Which two would correct this? (Choose two.)
1. You should pull the drive out immediately and replace it to prevent data corruption on the RAID set.
2. Soft SCSI bus errors can be safely ignored as they do not actually denote any service requirements.
3. You should research the error to determine the impact and proper response including the vendor in these discussions.
4. Review the logs from the array to identify if there is a pattern of large numbers of these SCSI errors. A large number of these SCSI bus errors may denote a predictive failure.
Answer: C, D
QUESTION: 96
A client has four servers they want to attach to a storage array containing 16 ports. Which
topology is the most cost effective for this situation?
1. star
2. mesh
3. point-to-point
4. switched Fabric
Answer: C
QUESTION: 97
The customer currently has 50 servers and 20 direct-attached storage arrays and wants to consolidate their data on a SAN. They want to be able to rapidly add storage and servers with
minimal impact to data availability. Which topology is most appropriate?
1. star
2. mesh
3. core-edge
4. round-robin
Answer: C
QUESTION: 98
A company is utilizing ITIL to create a high availability environment. Maintainability of the IT infrastructure consists of which three stages? (Choose three.)
1. cost of failures
2. detection of failures
3. anticipation of failures
4. restoration of the data and IT service
5. effect of failures on Service Level Agreements
Answer: B, C, D
QUESTION: 99
You are preparing a detailed design, applying ILM principles. Which two processes are performed during the detailed design phase? (Choose two.)
1. Develop an idealized environment.
2. Prepare work-task breakdown structure.
3. Define internal storage parameters used in the implementation.
4. Document current and proposed infrastructure, demonstrating change in capabilities.
Answer: B, C
QUESTION: 100
A four switch Fabric with 8 ports per switch using a full-mesh connectivity approach will have 20 ports available for Fabric attached devices. How many ports will be available using the full mesh approach when increasing the number of switches from four to six?
A.
12
B.
18
C.
20
D.
24
Answer: B
User: Roy*****![]() ![]() ![]() ![]() ![]() Thanks to the Killexams.com team, I was able to attempt their S10-300 exam questions and got full marks. It was the first time that I used their guidance material, and I appreciate their team effort. |
User: Massey*****![]() ![]() ![]() ![]() ![]() When I was searching for an internet exam simulator to take the s10-300 exam, I stumbled upon killexams.com. I was hesitant at first, so I downloaded the demos to see if their material could help me. To my delight, the demos had all the vital material that I needed to prepare for the exam. I found the questions and answers to be powerful, to the point, and well-organized. The material was so great that I passed the exam with ease. Thanks to killexams.com, I have a new level of respect for online exam preparation resources. |
User: Levushka*****![]() ![]() ![]() ![]() ![]() killexams.com provided me with excellent S10-300 material, including valid questions and correct answers. Their professional exam simulator was also great. I was relieved to find that this preparation pack had all the necessary information I needed to pass the S10-300 exam, and nothing unnecessary was included. As a result, I passed the S10-300 exam with a nearly perfect score. killexams.com has earned my trust for years to come. |
User: Nora*****![]() ![]() ![]() ![]() ![]() I am elated to report that I achieved the top score in the S10-300 exam, with all questions being from Killexams. This guide proved invaluable during my exam, guiding me in the right direction and leading to my success. I credit this guide entirely for my accomplishment, as it ensured that I was proficient in answering all S10-300 exam questions. |
User: Claudia*****![]() ![]() ![]() ![]() ![]() Preparing for the s10-300 practice exam requires a lot of effort and time management. Time management is a complex issue that is not easy to resolve, but killexams.com certification has resolved this issue from the root level by presenting a range of time schedules. This platform offers all the necessary educational courses essential for the s10-300 practice exam. Therefore, without wasting any time, begin your preparation with killexams.com certification and get an outstanding score in the s10-300 practice exam. |
Features of iPass4sure S10-300 Exam
- Files: PDF / Test Engine
- Premium Access
- Online Test Engine
- Instant download Access
- Comprehensive Q&A
- Success Rate
- Real Questions
- Updated Regularly
- Portable Files
- Unlimited Download
- 100% Secured
- Confidentiality: 100%
- Success Guarantee: 100%
- Any Hidden Cost: $0.00
- Auto Recharge: No
- Updates Intimation: by Email
- Technical Support: Free
- PDF Compatibility: Windows, Android, iOS, Linux
- Test Engine Compatibility: Mac / Windows / Android / iOS / Linux
Premium PDF with 100 Q&A
Get Full VersionAll Snia Exams
Snia ExamsCertification and Entry Test Exams
Complete exam list