QUESTION: 91

An array is behaving erratically. Upon working and troubleshooting with the vendor representative, you are told that the only way to clear the problem is to reboot the unit. The vendor states they have seen this behavior previously and feels it will return the unit to a fully operational status. Which three actions should you perform? (Choose three.)


  1. Retrieve any logs or dumps that exist on the array prior to reboot.

  2. Reboot the unit as soon as possible to lessen the risk of corruption.

  3. Identify the actions to commit if a reboot does not fix the problem before you reboot the array.

  4. If this is a known issue, request documentation outlining the symptoms, as well as the cause, if known.


Answer: A, C, D


QUESTION: 92

A company needs to create a tape backup strategy for a file system. On average the file system will be 60% full. Array based virtualization will be used to create the snapshot, which will only be used for the tape backup. Write activity on the production volume will be minimal during the backup process. Which will provide the least impact to the production application?


  1. COW snapshot mounted to a tutor/mount server

  2. COW snapshot mounted to the application server

  3. split mirror snapshot mounted to a tutor/mount server

  4. split mirror snapshot mounted to the application server


Answer: A


QUESTION: 93

What are three key advantages of deploying a director-based solution over a mesh of switches? (Choose three.)


  1. lower cost

  2. consistent latency

  3. improved availability

  4. increased hop count

  5. ease of management


Answer: B, C, E


QUESTION: 94



What information must be gathered during the testing phase BEFORE allowing live customer data on the storage infrastructure? (Choose two.)


  1. time to failover, both without and with simulated load

  2. single points of failure in the infrastructure as well as topology mapping

  3. hardware and software vendor escalation process including phone-home and/or ticket generation

  4. powerup order; how long from power application to functionality per component, including dependencies.


Answer: A, D


QUESTION: 95

You notice, from continually monitoring a SAN array, that an array has a number of soft SCSI bus errors. You trace the errors back to a single drive using a vendor's event tool. Which two would correct this? (Choose two.)


  1. You should pull the drive out immediately and replace it to prevent data corruption on the RAID set.

  2. Soft SCSI bus errors can be safely ignored as they do not actually denote any service requirements.

  3. You should research the error to determine the impact and proper response including the vendor in these discussions.

  4. Review the logs from the array to identify if there is a pattern of large numbers of these SCSI errors. A large number of these SCSI bus errors may denote a predictive failure.


Answer: C, D


QUESTION: 96

A client has four servers they want to attach to a storage array containing 16 ports. Which

topology is the most cost effective for this situation?


  1. star

  2. mesh

  3. point-to-point

  4. switched Fabric


Answer: C


QUESTION: 97

The customer currently has 50 servers and 20 direct-attached storage arrays and wants to consolidate their data on a SAN. They want to be able to rapidly add storage and servers with


minimal impact to data availability. Which topology is most appropriate?


  1. star

  2. mesh

  3. core-edge

  4. round-robin


Answer: C


QUESTION: 98

A company is utilizing ITIL to create a high availability environment. Maintainability of the IT infrastructure consists of which three stages? (Choose three.)


  1. cost of failures

  2. detection of failures

  3. anticipation of failures

  4. restoration of the data and IT service

  5. effect of failures on Service Level Agreements


Answer: B, C, D


QUESTION: 99

You are preparing a detailed design, applying ILM principles. Which two processes are performed during the detailed design phase? (Choose two.)


  1. Develop an idealized environment.

  2. Prepare work-task breakdown structure.

  3. Define internal storage parameters used in the implementation.

  4. Document current and proposed infrastructure, demonstrating change in capabilities.


Answer: B, C


QUESTION: 100

A four switch Fabric with 8 ports per switch using a full-mesh connectivity approach will have 20 ports available for Fabric attached devices. How many ports will be available using the full mesh approach when increasing the number of switches from four to six?


A.

12

B.

18

C.

20

D.

24


Answer: B


User: Tasya*****

The practice exam provided by Killexams.com was tremendous. I passed the s10-300 exam with a score of 100%, which was well worth the cost. I will be returning for my next certification soon. I want to thank you for providing me with prep practice tests for the s10-300 exam. They were certainly helpful for my preparation, and I did not get a single answer wrong! Such comprehensive exam preparatory material is an excellent way to score high in exams.
User: Tanis*****

Thanks to Killexams.com, I was able to pass the s10-300 exam and achieve my dream of getting certified. I had been dreaming of pursuing an s10-300 career for a long time, but I could not make time to study and prepare for the exam. However, Killexams.com’s comprehensive and easy-to-understand study materials and exam simulator made exam preparation manageable and convenient. I was even able to study while driving to work, and their accurate practice tests gave me the confidence to face the actual exam with ease.
User: Myren*****

I am thrilled to have passed my s10-300 exam with a 99% score, thanks to killexams.com’s valid and accurate questions. Their reliable materials and money-back guarantee gave me confidence, ensuring my success. I highly recommend their platform.
User: Polly*****

Two weeks before my S10-300 exam, a fire destroyed my study materials, leaving me in a panic. Fortunately, I discovered Killexams.com, and their free demo gave me a clear understanding of the content. With their practice tests, I was able to prepare effectively in a short time and passed the exam with ease. Killexams.com turned a dire situation into a success story, and I am beyond grateful.
User: Nicholi*****

I cannot believe I passed the S10-300 exam with such a high score, and I could not have done it without the help of Killexams.com. Your support was instrumental in my success. Thank you so much for everything!

Features of iPass4sure S10-300 Exam

  • Files: PDF / Test Engine
  • Premium Access
  • Online Test Engine
  • Instant download Access
  • Comprehensive Q&A
  • Success Rate
  • Real Questions
  • Updated Regularly
  • Portable Files
  • Unlimited Download
  • 100% Secured
  • Confidentiality: 100%
  • Success Guarantee: 100%
  • Any Hidden Cost: $0.00
  • Auto Recharge: No
  • Updates Intimation: by Email
  • Technical Support: Free
  • PDF Compatibility: Windows, Android, iOS, Linux
  • Test Engine Compatibility: Mac / Windows / Android / iOS / Linux

All Snia Exams

Snia Exams

Certification and Entry Test Exams

Complete exam list