Question: 87
Before working on equipment, what is the FINAL step in the lockout/tagout (LOTO) procedure?
1. Verify the equipment controls are in the proper operating position.
2. Train workers to perform the LOTO process.
3. Apply appropriate tags both locally and remotely.
4. Confirm the device is de-energized by proving it will not run when started.
5. Confirm all unnecessary items have been removed from the area.
Answer: C
Question: 88
Which two of the following are means in which radiated interference primarily enters electronic devices? (Select two options.)
1. Proximity to interfering sources
2. Missing or inadequate optical connections
3. Missing or inadequate device or cable shielding
4. Interface designs
5. Input signal lines
Answer: A, C
Question: 89
For the MAXIMUM flexibility of a cabling system in a hierarchical star topology, ALL backbone cables and links to FR’s should be terminated at the
1. HC (FD).
2. IC (BD).
3. TR
4. MC (CD)
Which of the following statements Is CORRECT concerning best practice for horizontal cable management panels?
1. One RU of management panel for each RU of cable patch panel plus one additional RU of cable management
2. Two RU of cable management panel for each RU of patch panel
3. Three RU of cable management panel for each RU of patch panel
4. Two RUs of management panel for each RU of cable patch panel plus two additional RUs of cable management
Answer: A
Question: 91
Close out documentation is initially discussed in which of the following meetings?
1. Prime Contractor and Subcontractor Meetings
2. Kickoff Meeting
3. Weekly Progress Meetings
4. Vendor Meeting
Answer: A
Question: 92
Which two of the following are ADVANTAGES of underground conduit systems? (Select two options.)
1. Provide additional physical cable protection
2. Not adaptable for future facility placement or removal without disturbing the property
3. Economical over a long life
4. Require more installation time than aerial or direct-buried installations
5. Route planning is not as critical as aerial or direct-burial
Answer: A, C
Question: 93
What is the MAXIMUM recommended length for A in the image below?
1. 70 m (230 ft)
2. 90 m (295 ft)
C. 100 m (320 ft)
D. 150 m (495 ft)
E. 300 m (985 ft)
Answer: B
Question: 94
Which of the following is TRUE about convenience receptacles?
1. They are duplex or quad receptacles mounted on perimeter walls.
2. They must be powered by emergency power to prevent loss of service.
3. They shall be connected to occupancy sensors to ensure user safety.
4. They increase the count of outlets needed on the equipment racks.
5. They are those into which equipment, such as switches, shall be plugged
Answer: A
Question: 95
When designing a video communications network, which type of video communication link is two-person videoconferencing?
1. Point-to-multipoint bidirectional
2. Point-to-multipoint unidirectional
3. Unidirectional
4. PTP unidirectional
5. PTP bidirectional
Answer: D
Question: 96
The type of apparatus housed in TRs varies greatly in size, purpose and function. Which two of the following active equipment is included? (Select two options.)
1. Cross-connect facilities
2. Telecommunication’s equipment
3. Environmental controls
4. Lighting controls
5. Building system equipment
Answer: B, E
Question: 97
What is the MINIMUM fire rating for telecommunications spaces walls and wall linings, if not specified otherwise by local Authority Having Jurisdiction (AHJ)?
1. One hour
2. Two hours
3. Three hours
4. No minimum requirement
Answer: B
Question: 98
For optical fiber cabling, which of the following test instruments is used to locate and identify any anomalies?
1. OTDR
2. Optical power meter
3. OLTS
4. Spectrum analyzer
Answer: A
Question: 99
What is the OPTIMAL lime in the construction process for ICT submittals to be reviewed by the ICT distribution designer?
1. After the contract is awarded and before project close out
2. As part of the contract bid process to prevent project delays
3. Before the contract is awarded
4. At the beginning of the close out process
For a cost estimate, an ICT distribution designer should produce a document listing each task with a cost placed beside them. The type of document used is a
A. So
1. spare ad sheet
2. worksheet
3. database
Answer: A
User: Ramil*****![]() ![]() ![]() ![]() ![]() Thanks to killexams.com, I passed my rcddv14 exam on my first attempt with a score of 98%. Their case studies and material were accurate and helpful. The only improvement I would suggest is adding a timer to the practice test. Thanks again, killexams.com. |
User: Elijah*****![]() ![]() ![]() ![]() ![]() Preparing for the rcddv14 exam was my goal this year, and I thought it would be a challenging journey. However, thanks to the positive reviews of killexams.com, I decided to use their study materials, which proved to be worth the investment. Their package provided every question that I encountered in the rcddv14 exam, which helped me to pass it with ease and come out of the test center happy and confident. Overall, it was a great exam experience that was well worth it. |
User: Mathew*****![]() ![]() ![]() ![]() ![]() I chose Killexams.com because I not only wanted to pass the rcddv14 exam, but I also wanted to achieve a high score that would make a great impression on others. Killexams.com provided me with the necessary support to accomplish this goal. I used their rcddv14 questions to prepare, and I received the highest marks in the class. Killexams.com helped me succeed where others had failed. |
User: Nastassi*****![]() ![]() ![]() ![]() ![]() At first, I was skeptical about the authenticity of killexams.com questions and answers, but when I saw them on the exam screen, I could not believe my eyes. I answered all of the questions in just 42 minutes and received an 89% score. killexams.com is made up of certified individuals who help professionals improve their knowledge and pass their exams with ease. Thank you, killexams.com. |
User: Catherine*****![]() ![]() ![]() ![]() ![]() I passed the rcddv14 exam with Killexams.com help. Although the rcddv14 certification is often underrated, it is an important credential, and I am proud to have earned it. Killexams.com package provided me with the precise information I needed to succeed, with no deceptive or incorrect information. I am grateful to the team of developers for their hard work. |
Features of iPass4sure RCDDv14 Exam
- Files: PDF / Test Engine
- Premium Access
- Online Test Engine
- Instant download Access
- Comprehensive Q&A
- Success Rate
- Real Questions
- Updated Regularly
- Portable Files
- Unlimited Download
- 100% Secured
- Confidentiality: 100%
- Success Guarantee: 100%
- Any Hidden Cost: $0.00
- Auto Recharge: No
- Updates Intimation: by Email
- Technical Support: Free
- PDF Compatibility: Windows, Android, iOS, Linux
- Test Engine Compatibility: Mac / Windows / Android / iOS / Linux
Premium PDF with 100 Q&A
Get Full VersionAll BICSI Exams
BICSI ExamsCertification and Entry Test Exams
Complete exam list