Certification Practice Test | PDF Questions | Actual Questions | Test Engine | Pass4Sure
RCDDv14 : BICSI Registered Communications Distribution Designer Exam

BICSI RCDDv14 Questions & Answers
Full Version: 100 Q&A
RCDDv14 Dumps RCDDv14 Braindumps RCDDv14 Real Questions RCDDv14 Practice Test RCDDv14 Actual Questions
BICSI
RCDDv14
BICSI Registered Communications Distribution Designer
https://killexams.com/pass4sure/exam-detail/RCDDv14
Question: 87
Before working on equipment, what is the FINAL step in the lockout/tagout (LOTO) procedure?
Verify the equipment controls are in the proper operating position.
Train workers to perform the LOTO process.
Apply appropriate tags both locally and remotely.
Confirm the device is de-energized by proving it will not run when started.
Confirm all unnecessary items have been removed from the area.
Answer: C
Question: 88
Which two of the following are means in which radiated interference primarily enters electronic devices? (Select two options.)
Proximity to interfering sources
Missing or inadequate optical connections
Missing or inadequate device or cable shielding
Interface designs
Input signal lines
Answer: A, C
Question: 89
For the MAXIMUM flexibility of a cabling system in a hierarchical star topology, ALL backbone cables and links to FR’s should be terminated at the
HC (FD).
IC (BD).
TR
MC (CD)
Which of the following statements Is CORRECT concerning best practice for horizontal cable management panels?
One RU of management panel for each RU of cable patch panel plus one additional RU of cable management
Two RU of cable management panel for each RU of patch panel
Three RU of cable management panel for each RU of patch panel
Two RUs of management panel for each RU of cable patch panel plus two additional RUs of cable management
Answer: A
Question: 91
Close out documentation is initially discussed in which of the following meetings?
Prime Contractor and Subcontractor Meetings
Kickoff Meeting
Weekly Progress Meetings
Vendor Meeting
Answer: A
Question: 92
Which two of the following are ADVANTAGES of underground conduit systems? (Select two options.)
Provide additional physical cable protection
Not adaptable for future facility placement or removal without disturbing the property
Economical over a long life
Require more installation time than aerial or direct-buried installations
Route planning is not as critical as aerial or direct-burial
Answer: A, C
Question: 93
What is the MAXIMUM recommended length for A in the image below?
70 m (230 ft)
90 m (295 ft)
C. 100 m (320 ft)
D. 150 m (495 ft)
E. 300 m (985 ft)
Answer: B
Question: 94
Which of the following is TRUE about convenience receptacles?
They are duplex or quad receptacles mounted on perimeter walls.
They must be powered by emergency power to prevent loss of service.
They shall be connected to occupancy sensors to ensure user safety.
They increase the count of outlets needed on the equipment racks.
They are those into which equipment, such as switches, shall be plugged
Answer: A
Question: 95
When designing a video communications network, which type of video communication link is two-person videoconferencing?
Point-to-multipoint bidirectional
Point-to-multipoint unidirectional
Unidirectional
PTP unidirectional
PTP bidirectional
Answer: D
Question: 96
The type of apparatus housed in TRs varies greatly in size, purpose and function. Which two of the following active equipment is included? (Select two options.)
Cross-connect facilities
Telecommunication’s equipment
Environmental controls
Lighting controls
Building system equipment
Answer: B, E
Question: 97
What is the MINIMUM fire rating for telecommunications spaces walls and wall linings, if not specified otherwise by local Authority Having Jurisdiction (AHJ)?
One hour
Two hours
Three hours
No minimum requirement
Answer: B
Question: 98
For optical fiber cabling, which of the following test instruments is used to locate and identify any anomalies?
OTDR
Optical power meter
OLTS
Spectrum analyzer
Answer: A
Question: 99
What is the OPTIMAL lime in the construction process for ICT submittals to be reviewed by the ICT distribution designer?
After the contract is awarded and before project close out
As part of the contract bid process to prevent project delays
Before the contract is awarded
At the beginning of the close out process
For a cost estimate, an ICT distribution designer should produce a document listing each task with a cost placed beside them. The type of document used is a
A. So
spare ad sheet
worksheet
database
Answer: A
User: Elsie*****![]() ![]() ![]() ![]() ![]() Thanks to the killexams.com brain practice test study guide, I was able to pass my RCDDV14 exam in just 20 days of preparation. The practice tests completely changed my life after I started using them. I now work in a decent organization with a good salary. I want to thank the entire team of trutrainers for their assistance in securing the difficult topics and providing useful references for study. I answered almost all questions in just half of the time allotted for the exam. |
User: Julieta*****![]() ![]() ![]() ![]() ![]() As one of the high achievers in the RCDDV14 exam, I can say that the Questions and Answers material provided by killexams.com was superb. I grasped the whole content on all of the applicable subjects in a short time. It was a virtually admirable learning experience for me, and I passed my exam without issues or worries. Thank you, killexams.com, for the real help. |
User: Pyotr*****![]() ![]() ![]() ![]() ![]() The guide provided by killexams.com was an excellent resource that I used daily to prepare for my exam. It helped me achieve a fantastic score in the RCDDV14 exam, offering the expertise to perform better in the exam. I am grateful for the outstanding assistance provided by killexams.com. |
User: Wan*****![]() ![]() ![]() ![]() ![]() As an IT professional, passing the RCDDV14 exam was important to me, but time restraints made it difficult to prepare. The easy-to-memorize answers in the Killexams.com test guide made it easy to put together. It worked as a whole reference guide, and I was surprised by the result. I read the Killexams.com test guide two weeks before the exam, finished all of the questions well beneath the stipulated time, and passed. |
User: Agatha*****![]() ![]() ![]() ![]() ![]() Thanks to Killexams.com, I had access to a wonderful study guide that helped me score high on my RCDDV14 exam. I appreciate the way Killexams.com conducts their exam training. The questions provided in their study material are similar to those that appear in the real RCDDV14 exams. Their exam simulator and practice exam format helped me memorize all the information, making it easier to recall during the exam. The learning engine is user-friendly and very intuitive, and I did not encounter any troubles, making it an excellent value for money. |
Features of iPass4sure RCDDv14 Exam
- Files: PDF / Test Engine
- Premium Access
- Online Test Engine
- Instant download Access
- Comprehensive Q&A
- Success Rate
- Real Questions
- Updated Regularly
- Portable Files
- Unlimited Download
- 100% Secured
- Confidentiality: 100%
- Success Guarantee: 100%
- Any Hidden Cost: $0.00
- Auto Recharge: No
- Updates Intimation: by Email
- Technical Support: Free
- PDF Compatibility: Windows, Android, iOS, Linux
- Test Engine Compatibility: Mac / Windows / Android / iOS / Linux
Premium PDF with 100 Q&A
Get Full VersionAll BICSI Exams
BICSI ExamsCertification and Entry Test Exams
Complete exam list