GAQM CLSSYB Questions & Answers

Full Version: 120 Q&A

CLSSYB Dumps CLSSYB Braindumps CLSSYB Real Questions CLSSYB Practice Test
CLSSYB Actual Questions
killexams.com GAQM CLSSYB
Certified Lean Six Sigma Yellow Belt (CLSSYB)
https://killexams.com/pass4sure/exam-detail/CLSSYB
QUESTION: 109
It is recommended that when beginning a 5S program it be started in a pilot work area for learning and demonstration purposes then it is expended throughout the plant.
1. True
2. False
Answer: A
QUESTION: 110
As part of a Visual Factory plan are created and utilized to identify areas in need of cleaning and organization.
1. Flashing lights
2. Soft horns
3. Kanban cards
4. Operator announcement programs
Answer: C
QUESTION: 111
One of the 5S approaches to eliminating waste is to organize all tools, information and inventory utilized at a workstation in such a manner that the operator knows exactly where things are when needed. This 5S tool is called .
1. Standardizing
2. Scheduling
3. Sustaining
4. Straightening
Answer: D
QUESTION: 112
The Control Plan is the road map to sustaining the improvements made through the Lean Six Sigma project and should therefore involve keeping the up to date as a means of supporting the Response Plan in case a defect is noticed.
1. X-Y Diagram
2. Shewhart Chart
3. FMEA
4. Customer Service Plan
Answer: C
QUESTION: 113
To minimize waste through the application of Lean Principles we do which of the following?
1. Collect sample data
2. Keep the work area clean and organized
3. Calibrate our measurement tools
4. Survey the customer
Answer: B
QUESTION: 114
A Lean Principle that states the process of eliminating waste is a continual process requiring one to always be on the lookout for ways to reduce the seven elements of waste is known as
1. Ishikawa
2. Kaizen
3. Kanban
4. Muda
Answer: B
QUESTION: 115
An important factor in a viable is to determine who, when and to what level various personnel must be trained to maintain the improvements made to a process.
1. Control Plan
2. FMEA
3. Standard Operating Procedure
4. Process Map
Answer: C
QUESTION: 116
A Monitoring Plan put into place at the conclusion of a project will provide for adequate systems with key metric readouts indicating out-of-spec conditions.
1. True
2. False
Answer: A
QUESTION: 117
The Control Plan is created following the finalization of the Measure Phase and can be closed when?
1. After the project costs have been recouped
2. When the Champion says so
3. Never, a Control Plan must stay in place
4. At the fiscal yearend of the business
Answer: C
QUESTION: 118
Systems and structures are the basis for allowing people to change their behaviors permanently and are accomplished through which of the following?
1. Documented performance objectives
2. Defined procedures
3. Accurate job descriptions
4. Incentive compensation
5. All of these answers are correct
Answer: E
QUESTION: 119
To reduce the people or operator introduced defects into a process it is best if a Belt can design and implement a means of into the process.
1. Measurement automation
2. Operator alertness
3. Full Automation
4. Constant supervision
Answer: C
QUESTION: 120
Upon completion of a project a Belt must complete the Documentation Plan then transfer responsibility for this to the .
1. Project Review Committee
2. Division Manager
3. Sales Team
4. Process Owner
Answer: D

User: Timofey*****

I used Killexams.com to prepare for clssyb and found that they have excellent materials. I plan to use them for other GAQM exams as well. Their comprehensive resources truly make a difference in exam readiness.
User: Fanny*****

Despite my hectic schedule, Killexams.com’s questions and answers motivated me to finally take the clssyb exam. Their support clarified all my doubts, and I was thrilled to achieve a 97% score. Their guidance was nothing short of phenomenal.
User: Tillie*****

I was initially skeptical, but Killexams.com’s study materials helped me pass the clssyb exam with an 80% score. Their effectiveness is undeniable, and I am extremely pleased with the results.
User: Meera*****

Testprep materials delivered a 96% score on my CLSSYB certification exam, transforming my initial skepticism into complete trust. A friend’s high score prompted me to try their platform, despite my initial doubts, and the results were astounding. Their comprehensive practice tests prepared me thoroughly, and I now enthusiastically advocate for their resources to others seeking certification success.
User: Mischka*****

The killexams.com materials were outstanding, covering every aspect needed for a thorough clssyb exam plan. I answered 89 out of 100 questions using their Questions and Answers and Exam Simulator. This preparation tool is reliable and effective, even for those not planning to take the clssyb exam but seeking to enhance their knowledge. For clssyb candidates, killexams.com is the key to success.

Features of iPass4sure CLSSYB Exam

  • Files: PDF / Test Engine
  • Premium Access
  • Online Test Engine
  • Instant download Access
  • Comprehensive Q&A
  • Success Rate
  • Real Questions
  • Updated Regularly
  • Portable Files
  • Unlimited Download
  • 100% Secured
  • Confidentiality: 100%
  • Success Guarantee: 100%
  • Any Hidden Cost: $0.00
  • Auto Recharge: No
  • Updates Intimation: by Email
  • Technical Support: Free
  • PDF Compatibility: Windows, Android, iOS, Linux
  • Test Engine Compatibility: Mac / Windows / Android / iOS / Linux

Premium PDF with 120 Q&A

Get Full Version

All GAQM Exams

GAQM Exams

Certification and Entry Test Exams

Complete exam list