QUESTION: 151
Can the Lead Network Operations Business Manager start operational delivery after the baseline shows an expected 30% negative gross margin?
1. No. Maximum accepted negative gross margin is 10%.
2. Yes. NSN needs to fulfill its obligations and execute operational service delivery anyway.
3. Yes. If the Cost Baseline is in line with the Business Case.
4. Only after the Cost Baseline is approved according to the required approval levels in the Region.
Answer: D
QUESTION: 152
Which of these Key Performance Indicators (KPI) supports the identification of possible cost overruns?
1. Project Cost Adherence (PCA)
2. Gross Margin (GM)
3. Actual Costs.
4. Forecast Costs (NELLE)
Answer: A
QUESTION: 153
Which team provides the majority of remote support to the GNOC regarding fault fixing?
1. Configuration Management.
2. Field Operations.
3. Performance Management.
4. Customer Care back office.
Answer: B
QUESTION: 154
You are supporting the review of the SLA's and are asked to advise the two 'Exemptions' that will have MOST impact. Which are the 2 with MOST impact?
1. Non aligned 3rd Party SLA's & NSN Customer Contract SLA's & Performance/Capacity limitations arising caused by special holidays.
2. Performance degradation caused by activities not approved by NSN & Planned downtime for activities necessary to maintain and optimise the network.
3. Planned downtime for activities necessary to maintain and optimise the network & Performance degradations caused by subcontractors.
4. Planned downtime for activities necessary to maintain and optimise the network & non aligned 3rd Party SLA's & NSN Customer Contract SLA's.
Answer: D
QUESTION: 155
You have a Trouble Ticketing system that has a limited capability, which other function can you use to assist you when calculating the SLA?
1. Configuration Management
2. OSS Management
3. Fault Management
4. Performance Management
Answer: D
QUESTION: 156
Which statement BEST describes the key requirements for setting up Field Operations tools and process?
1. Ensure effective Work Force Management and contractor Mgt process and tools.
2. Ensure effective Work Force Management and Subcontractor Mgt process and tools.
3. Ensure effective contractor management and Spare Part Management process and tools.
4. Ensure effective Work Force Management and Spare Part Management process and tools.
Answer: D
QUESTION: 157
The customer CTO calls you (The Technical Support Manager) directly to resolve a service outage in what he describes as strategically important area. What is the correct course of action?
1. Call out a Technical Support Engineer to immediately resolve the issue.
2. Request the NOC to raise an urgent TT for the issue.
3. Escalate to FLM.
4. Immediately advise the CT head of the situation and request advice for prioritisation.
Answer: B
Explanation:
21Apres - Time Management
QUESTION: 158
The customer has an urgent request for network tuning in a specific area due to significant cases of call drop, with the promise of increasing business opportunity in another area which is mainly in the hands of the other supplier (competitor), what's the correct way to answer this request?
1. It's a major network problem for which NSN could get the blame: therefore I will act to complete this additional service as soon as possible without hassling the customer with any administration.
2. This additional service improves the partnership between NSN and customer along with the high probability to increase the business and NSN's footprint. Therefore I will act to complete this additional service as soon as possible without a PO.
3. I assure the customer that NSN is going to solve the problem by our professional network planning and optimization service, but in order to obtain all required resources and tools, it's necessary to have a purchase order to start the activities.
4. I will escalate this customer request to the Customer Team and ask to approve the related risk order.
Answer: C
QUESTION: 159
What are the MOST critical requirements in Field Operations to ensure performance quality?
1. Planning maintenance 24x7 and having people available.
2. Making sure there are sufficient people and spare parts to fix faults.
3. Meeting response times with suitably qualified and resourced people for assigned Work Orders.
4. Ensuring there is a WFM system in place.
Answer: C
QUESTION: 160
Which Network Operations process utilises the majority of resources?
1. Performance Management.
2. Alarm Monitoring
3. Configuration Management.
4. Fault Management.
Answer: B

User: Julieta*****

Passing the SDM-2002001030 exam proved to be a challenging task for me. However, killexams.com aided me in gaining composure and using their SDM-2002001030 practice tests to prepare myself for the exam. Their SDM-2002001030 exam simulator was particularly helpful, and thanks to it, I passed the SDM-2002001030 exam and even got promoted in my company. I am grateful to the team for their useful questions and answers that helped me complete the exam on the first try.
User: Laika*****

Investing in Killexams.com was worth it. The practice tests are noteworthy and provide good value for the money. The questions and answers are valid and accurate, and I even double-tested them with friends. Passing the exam was easy, and I wholeheartedly recommend Killexams.com to anyone looking to take the sdm-2002001030 exam.
User: Maryam*****

I passed my pdm ms (sdm_2002001030) exam in just 20 days of preparation using killexams.com brain dump practice tests. The practice tests virtually changed my life, and now I am employed in a great organization with a decent income. killexams.com material is useful for exam preparation, and they provide remarkable references. I was able to answer nearly all questions in only half of the time thanks to killexams.com.
User: Martha nods*****

I recently passed the Nokia SDM-2002001030 exam with a 98% score, thanks to the question bank provided by Killexams.com. Despite extensive reading, the question bank provided me with enough preparation, and all my doubts were clarified in minimum time. I look forward to using your services in the future. Thank you, Killexams.com, for doing a fantastic job.
User: Natalia*****

I am writing to thank the team at Killexams.com for their useful question bank. I passed my sdm-2002001030 exam on the first attempt, and this would not have been possible without their help. The questions in their package were accurate, and I appreciate the effort they put into helping me succeed.

Features of iPass4sure SDM-2002001030 Exam

  • Files: PDF / Test Engine
  • Premium Access
  • Online Test Engine
  • Instant download Access
  • Comprehensive Q&A
  • Success Rate
  • Real Questions
  • Updated Regularly
  • Portable Files
  • Unlimited Download
  • 100% Secured
  • Confidentiality: 100%
  • Success Guarantee: 100%
  • Any Hidden Cost: $0.00
  • Auto Recharge: No
  • Updates Intimation: by Email
  • Technical Support: Free
  • PDF Compatibility: Windows, Android, iOS, Linux
  • Test Engine Compatibility: Mac / Windows / Android / iOS / Linux

Premium PDF with 160 Q&A

Get Full Version

All Nokia Exams

Nokia Exams

Certification and Entry Test Exams

Complete exam list