Question: 72
A customer needs to aggregate uplink ports from two Virtual Connect interconnects to increase bandwidth and availability of the networks configured for HPE Synergy platform.
Which steps must the integrator perform in the configuration to meet the customer’s needs?
Connect Satellite modules using Ports L1 and L4
Connect Ports Q7 and Q8 on the Master interconnect Modules (ICM)
Install Redundant Frame Link Modules and a second management ring
Enable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules
Answer: A
Question: 73
Which component of the HPE Synergy solution should you use to set the firmware/driver baseline and the installation method for Synergy Compute nodes?
Composer
Smart Update
Image Streamer
Global Dashboard
Answer: B
Reference: https://support.hpe.com/hpsc/doc/public/display?docId=c05212310
Question: 74
Which storage solution can be used for volume provisioning using HPE Composer?
MSA 2040
HPE StoreEasy 1560
HPE 3PAR StoreServ
HPE XP7 Storage
Answer: C
Reference: https://www.karma-group.ru/upload/iblock/30b/hpe_synergy_composer.pdf
Question: 75
An integrator prepares deployment documents with the list of all the hardware and software components. The integrator also needs a list of all infrastructure services deployed, with the functionality described.
Which services are provided by the vCenter Server component and should be placed in the report? (Choose two.)
Auto Deploy
Single Sign-On
Update Manager
Lookup Service
Certificate Authority
Answer: CD
Question: 76
A customer needs to evaluate Image Streamer as Proof-of-Concept (PoC) in a test and development tab environment. At a minimum, what does a Synergy integrator need in order to support this requirement?
a three-frame environment with redundant composer and Image Streamer appliances
a single frame with single composer and Image Streamer appliances
a two-frame environment with single composer and Image Streamer appliances
a single frame with redundant Image Streamer appliances
Answer: B
Question: 77
An integrator is installing three Synergy frames in different locations for a customer. As part of the installation, the customer requests a single monitoring dashboard that shows the current hardware status, warranty status, and open support cases of all three frames.
Which configuration steps must the integrator perform to provide the customer with this functionality?
Enable Remote Support and Insight Online Integration in the Composer UI
Install Insight Remote Support Advanced, and integrate it with HPE Global Dashboard
Configure OneView with iLO Amplifier pack
Activate iLO Federation on all installed compute nodes
Answer: C
Question: 78
What are valid uses for an IPv4 address pool when configuring an HPE Synergy solution? (Choose two.)
assignment of IP addresses for NICs in an operating system
assignment of IP addresses for Composer appliances
assignment of IP addresses for PXE booting to a deployment server
assignment of IP addresses for interconnect modules
assignment of IP addresses for iLOs
Answer: DE
Reference: https://techlibrary.hpe.com/docs/synergy/shared/setup_overview/index.html
Question: 79
Which policy can an integrator apply when creating a datastore using HPE OneView for vCenter Server?
Data at Rest encryption policy
Round Robin load balancing policy
Recovery Manager Central policy
virtual machine Restart policy
Answer: C
Question: 80
Refer to the exhibit.
Interconnect bays 1 and 2; bays 3 and 4; bays 5 and 6.
Interconnect bays 1 and 6; bays 2 and 5; bays 3 and 4.
Interconnect bays 1 and 4; bays 2 and 5; bays 3 and 6.
Interconnect bays 1 and 3; bays 2 and 4; bays 5 and 6.
Answer: C
Reference: https://h20195.www2.hpe.com/v2/GetPDF.aspx/c04815113.pdf
Question: 81
Refer to the exhibit.
What is the likely cause of this issue?
FCoE capable interconnect modules are not installed in the Synergy frame
Defined FCoE network is not associated with a SAN or does not have VLAN Id defined
A FCoE connection is not available, as there is no LIG configured for FCoE connectivity
The FCoE connection has not been added as a Fibre Channel connection within a server profile
Answer: D
Question: 82
In a 3-frame HPE Synergy environment, how should an integrator place the image Streamer modules to allow for redundancy to all of the management connections?
one Image Streamer module in frame 2, and a second Image Streamer Module in frame 3 (2 total)
two Image Streamer modules in frame 2, and two Image Streamer modules in frame 3 (4 total)
one Image Streamer module in each Synergy frame (3 total)
two Image Streamer modules in frame 1 (2 total)
Answer: B
Reference: https://www.karma-group.ru/upload/iblock/2be/synergy_image_streamer.pdf (page 7)
Question: 83
What must an integrator do before an existing cluster can be imported to the HPE Composer?
The vCenter Server must be integrated with the HPE Composer
The cluster must be vSAN enabled
The HPE Composer must have at least two management interfaces to connect to the cluster
The cluster must be enabled for HPE Composer integration
Answer: A
Question: 84
During an initial setup of a Synergy environment, an integrator needs to enable or disable authorized Service access. What will be the outcome when the integrator disables this service?
Authenticated administrators will be unable to make changes to the system
Authorized users will be unable to generate a support dump
Authenticated administrators will be unable to access the system
Authorized support will be unable to diagnose the system
Answer: D
Reference: https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-c05098314 (62)
Question: 85
FILL BLANK
A customer has the following configuration: Frame 1
Bay 1 – HPE Synergy 12Gb SAS Connection Module
Bay 2
Bay 3 – HPE Virtual Connect SE 40 GB F8 Module
Bay 4 – HPE Synergy 12GB SAS Connection Module
Bay 5
Bay 6 – HPE Synergy 10 Gb Interconnect Link Module Frame 2
Bay 1 – HPE Synergy 12Gb SAS Connection Module
Bay 2
Bay 3 – HPE Synergy 10Gb Interconnect Link Module
Bay 4 – HPE Synergy 12Gb SAS Connection Module
Bay 5
Bay 6 – HPE Virtual Connect SE 40Gb F8 Module
How many more frames can the customer add to their Synergy composable fabric? (Note: Enter your answer in the answer field below.)
A. See explanation below.
Answer: A
Frame 1 – Bay 2 – HPE Virtual Connect SE 100Gb F32 Module for Synergy (867796-B21)
Frame 1 – Bay 5 – HPE Virtual Connect SE 16Gb Fibre Channel Module for Synergy (779227-B21)
Frame 2 – Bay 2 – Brocade 16Gb/24 Power Pack+ Fibre Channel SAN Switch Module for HPE Synergy (K2Q86A) Frame 2 – Bay 5 – HPE Synergy 4820C 10/20/25Gb Converged Network Adapter (876449-B21)
User: Abigail*****![]() ![]() ![]() ![]() ![]() I want to give a massive thank you to Killexams.com for providing me with practice tests for the hpe0-s58 exam. The practice tests were indeed helpful for preparing for the test and passing it. I did not get a single answer wrong. Such complete exam preparatory material is a great way to achieve excellence in exams. The practice exams are excellent, and I will return for my next certification. |
User: Olyssia*****![]() ![]() ![]() ![]() ![]() We are thrilled to hear that our hpe0-s58 exam training was the best you have ever come across. Its always great to hear that our product has helped reduce the pressure, worries, and frustrations that come with taking an exam. We appreciate your trust in our product and look forward to helping you achieve success in your future certification exams. |
User: Lida*****![]() ![]() ![]() ![]() ![]() I passed my HPE0-S58 exam on my first try with 75% after just two days of studying. I am grateful to Killexams.com for their valuable questions, which helped me pass the exam without any worries. I am looking forward to preparing for the HPE0-S58 exam with their assistance. |
User: Zoey*****![]() ![]() ![]() ![]() ![]() I used Killexams.com HP test preparation materials to prepare for the HPE0-S58 exam. It was challenging but overall very helpful in passing my HPE0-S58 exam. |
User: Henry*****![]() ![]() ![]() ![]() ![]() I was able to pass the HPE0-S58 exam with a high 97% mark, and I owe it all to killexams.com. Although I was very busy with my office assignments, I was inspired to take on the exam after discovering their questions and answers. Their material was genuinely supportive and helped resolve all my doubts on the HPE0-S58 exam. |
Features of iPass4sure HPE0-S58 Exam
- Files: PDF / Test Engine
- Premium Access
- Online Test Engine
- Instant download Access
- Comprehensive Q&A
- Success Rate
- Real Questions
- Updated Regularly
- Portable Files
- Unlimited Download
- 100% Secured
- Confidentiality: 100%
- Success Guarantee: 100%
- Any Hidden Cost: $0.00
- Auto Recharge: No
- Updates Intimation: by Email
- Technical Support: Free
- PDF Compatibility: Windows, Android, iOS, Linux
- Test Engine Compatibility: Mac / Windows / Android / iOS / Linux
Premium PDF with 85 Q&A
Get Full VersionAll HP Exams
HP ExamsCertification and Entry Test Exams
Complete exam list